欧美日韩国产一页|四色AV一区二区|丁香婷婷伊人在线|国产 超碰 AV|婷婷成人片视频看看|亚洲无码丁香在线|亚洲1区二区无码精品美人|青草av.245|最新福利无码视频|精品夫妻一区二区三区

Cn

Amazing Chinese infrastructure!
Source:Qufu Juli Release Date:2020-7-15
Read:15

At 2:00 am on December 2nd, the "throat passage" of Beijing Daxing International Airport Expressway was officially opened, and the main body of the expressway was basically completed

厲害了中國基建!四座橋梁同步轉體 90分鐘后“優(yōu)良牽手”


Amazing Chinese infrastructure! Four bridges rotate synchronously for 90 minutes before 'excellent hand holding'


At 2:00 am on December 2nd, the "throat passage" of Beijing Daxing International Airport Expressway was officially opened, and the main body of the expressway was basically completed.


At 0:30 in the morning, four bridges with a total weight of 10000 tons on three lines started rotating synchronously and docked with the opposite line 90 minutes later.


The 'Three Lines and Four Bridges' all pass through the Beijing Shanghai Railway and the Beijing Shanghai High speed Railway on their way to the new airport. In order to avoid affecting the normal operation of these two busy lines and reduce the occupation of existing land, all three lines adopt the structure of elevated bridges.


The successful transformation of the "Three Lines and Four Bridges" marks the official opening of the "throat passage" of the Beijing Daxing International Airport Expressway, laying the foundation for ensuring its completion and opening to traffic in 2019.